NEW QUESTION # 17
(Select 2) What factors favor centralized decision-making?

  • A. Economies of scale
  • B. Infrequent decisions.
  • C. High cost of delay
  • D. Need for fast decision-making.
  • E. Appropriate authority level of the decision maker.

Answer: A,B


NEW QUESTION # 18
What is the key reason for deploying each team increment to the production-equivalent staging environment?

  • A. Teams can verify whether new functionality or Nonfunctional Requirements are compatible with the
    current production configuration.
  • B. It allows the System Team to test the deployability of the Solution.
  • C. It enable SAFe teams to Develop on Cadence and Release Any Time.
  • D. If something goes wrong with the production environment, teams can switch their staging to perform the role of production.

Answer: C


NEW QUESTION # 19
What is the most effective way to train the System Team members to operate effectively as part of the train?

  • A. Have them attend Leading SAFe training and Scrum Master orientation.
  • B. Have them attend Leading SAFe training.
  • C. Have them attend Implementing SAFe training with SPC certification.
  • D. Have them attend SAFe for Teams training with all other teams on the train.
  • E. Have them review the SAFe Foundations presentation and provide on-the-job training.

Answer: D


NEW QUESTION # 20
(Select 2) What are the 2 biggest reasons to reduce batch size?

  • A. Produce less measurement overhead.
  • B. Increase delivery reliability.
  • C. Decrease stress on the system.
  • D. Make it easier to assess the state of smaller batches.
  • E. Increase throughput.

Answer: B,E


NEW QUESTION # 21
A Program Epic that originates from a Portfolio Epic takes precedence over all local priorities on that train.

  • A. False
  • B. True

Answer: A


NEW QUESTION # 22
Vikas is a new Solution architect and is trying to understand the Solution Context. What is the most important
factor for him to consider?

  • A. The environment in which the Solution is deployed.
  • B. The Economic Framework for the Value Stream.
  • C. Job sequencing for the Epics in the Value Stream Backlog.
  • D. The acceptance Criteria for the Capabilities.

Answer: A


NEW QUESTION # 23
Test automation is typically included in the Definition of Done (DoD).

  • A. False
  • B. True

Answer: A


NEW QUESTION # 24
When is the best time to release a product or Solution to the marketplace?

  • A. At the end of the IP Iteration.
  • B. At quarterly boundaries.
  • C. Whenever it meets relevant governance and market criteria.
  • D. At each PI boundary, provided there are no PI defects.

Answer: C


NEW QUESTION # 25
What is NOT a SAFE-recommended Metric?

  • A. Number of test cases produced.
  • B. Number of lines of code produced.
  • C. Percent of user stories accepted by the Product Owner.
  • D. Number of new test cases automated.
  • E. Percent of unit test coverage.
  • F. Number of defects outstanding.

Answer: B


NEW QUESTION # 26
(Select 2) What factors help unlock the intrinsic motivation of knowledge workers?

  • A. Autonomy.
  • B. Making a contribution.
  • C. Ranking individuals for transparency in their contributions to the organization.
  • D. Well-structured MBOs so people know exactly what's expected of them.
  • E. Individual and team performance incentives.

Answer: A,B


NEW QUESTION # 27
What do Value Streams deliver?

  • A. Cyber-physical systems
  • B. Solutions
  • C. Strategic Themes
  • D. Agile Release Trains

Answer: B


NEW QUESTION # 28
What concept is NOT on of the Core Value of SAFe?

  • A. Built-in Quality
  • B. Alignment
  • C. Program execution
  • D. Predictability
  • E. Transparency

Answer: D


NEW QUESTION # 29
What contributes to establishing trust in SAFe?

  • A. Reporting.
  • B. Decentralization of control.
  • C. U-curve optimization.
  • D. Servant leadership.
  • E. Transparency.

Answer: E


NEW QUESTION # 30
(Select 2) What steps in the Portfolio Kanban are most appropriate for running research spikes?

  • A. Implementing-teams perform spikes as usual
  • B. Funnel-understand whether the Epic makes sense.
  • C. Analysis-spikes help clarify feasibility.
  • D. Portfolio Backlog-run a spike before pulling into development.

Answer: B,C


NEW QUESTION # 31
(select 2) What are the benefits of cadence and synchronization?

  • A. Synchronization enables reduction in WIP.
  • B. They enable systems builders to operate reliably and with certainty within a safety buffer.
  • C. Cadence enables variability and makes wait times predictable.
  • D. Synchronization enables multiple perspectives to be understood, resolved, and integrated at the same
    time.
  • E. Cadence limits variance.

Answer: D,E


NEW QUESTION # 32
What activity calls for using ROAM technique?

  • A. Managing the ART sync.
  • B. Categorizing program risks during PI Planning.
  • C. Managing teams by the Release Train Engineer.
  • D. Refining the Program Backlog.

Answer: B


NEW QUESTION # 33
(select 3) What are the 3 primary outputs of PI Planning?

  • A. Vote of confidence/commitment
  • B. Team PI Objectives
  • C. Program board
  • D. Portfolio Vision
  • E. Iteration Goals
  • F. Top 10 Features

Answer: A,B,C


NEW QUESTION # 34
What statement applies to Iteration Planning in SAFe?

  • A. Iteration Planning is required in every Iteration to enable fast learning cycles.
  • B. Iteration Planning is required for all Iterations except for the first one, since there's nothing to cause a
    change in the PI plan yet.
  • C. Component teams require Iteration Planning in every Iteration, while Feature teams may or may not,
    based on dependencies.
  • D. When the teams define acceptance criteria during PI Planning, Iteration Planning is not strictly required during the PI.
  • E. Teams that have no dependencies may choose not to do Iteration Planning once they have planned the
    PI.

Answer: A


NEW QUESTION # 35
What does innovation accounting mean?

  • A. Capitalizing the cost of software development using Story points.
  • B. Being sure to account for the investment in new product initiatives on a P&L.
  • C. Demoing Stories that come out of the IP Iteration.
  • D. Defining, empirically measuring, and communicating the true progress of innovation.

Answer: D


NEW QUESTION # 36
What activity occurs during the program Inspect and Adapt workshop?

  • A. Team Iteration Demo
  • B. Biweekly System Demo
  • C. Iteration Metrics update
  • D. Roadmap update
  • E. PI Predictability Measure update.

Answer: E


NEW QUESTION # 37
Select 2) You are prioritizing Epics and the group cannot reach a consensus on WSJF parameters. What would
be the best course of action to reduce inconsistencies?

  • A. Change the scale for WSJF parameters.
  • B. Use strategic themes to help the group understand how an Epic contributes to the realization of the
    enterprise business strategy.
  • C. Collect additional input from other stakeholders.
  • D. Take time to provide more detailed specifications for each Epic.
  • E. Split Epics into Capabilities, prioritize them, and combine those priorities back to the Epic level.

Answer: B,D


NEW QUESTION # 38
(Select 3) Who is typically involved in the ART Sync?

  • A. Scrum Masters
  • B. Release Management
  • C. Release Train Engineer
  • D. Solution Management
  • E. Product Owners
  • F. Business Owners

Answer: A,C,E


NEW QUESTION # 39
Understanding the full Value Stream allows you to focus on the delays.

  • A. True
  • B. False

Answer: A


NEW QUESTION # 40
AFe assumes that programs commit to the key priorities within the current PI and provide a forecast for a few
subsequent PIs.

  • A. True
  • B. False

Answer: A


NEW QUESTION # 41
(Select 2) What are the characteristics of queues and backlogs?

  • A. Queues are processed in the order in which items are entered.
  • B. Backlogs are continuously refined and can be re-prioritized.
  • C. Queues are continuously refined and cannot be re-prioritized.
  • D. Backlog items are estimated; queues are not.

Answer: A,B