[Q101-Q118] 350-601 Dumps are Available for Instant Access [2024]

Share

350-601 Dumps are Available for Instant Access [2024]

Practice with these 350-601 dumps Certification Sample Questions


Cisco 350-601 exam is an essential certification test for professionals who want to advance their careers in data center technologies. 350-601 exam validates an individual's skills and knowledge in implementing and managing data center technologies, and it opens up a wide range of career opportunities. Passing the exam requires dedication and hard work, but the rewards are well worth the effort.

 

NEW QUESTION # 101
Which configuration generates a syslog message when CPU utilization is higher than 60%?

  • A. event manager applet HIGH-CPU
    event snmp oid 1.3.6.1.4.1.9.9.109.1.1.1.1.6.1 get-type exact entry-op gt 60 poll-interval 5 action 1.0 syslog priority notifications msg "cpu high"
  • B. event manager applet HIGH-CPU
    event snmp oid 1.3.6.1.4.1.9.9.109.1.1.1.1.6.1 get-type exact entry-op lt 60 poll-interval 5 action 1.0 syslog priority notifications msg "cpu high"
  • C. event manager applet HIGH-CPU
    event snmp oid 1.3.6.1.4.1.9.9.109.1.1.1.1.6.1 get-type next entry-op gt 60 poll-interval 5 action 1.0 syslog priority notifications msg "cpu high"
  • D. event manager applet HIGH-CPU
    event snmp oid 1.3.6.1.4.1.9.9.109.1.1.1.1.6.1 get-type next entry-op lt 60 poll-interval 5 action 1.0 syslog priority notifications msg "cpu high"

Answer: A

Explanation:
https://www.cisco.com/c/en/us/support/docs/ip/internet-protocol-ip/200931-EEM-Subsystem-in-Order-to- Monitor-CPU-Tr.pdf
https://blog.ipspace.net/2008/06/generate-snmp-trap-on-high-cpu-load.html


NEW QUESTION # 102
How do your preprovision a Cisco UCS chassis?

  • A. Select preprovision from the general menu of the chassis.
  • B. Configure server pool policies for the chassis
  • C. Associate a service profile template to the chassis.
  • D. Associate service profiles to each slot.

Answer: D

Explanation:
Specifies the chassis and slot that contains the server which will be assigned to the service profile.
If the server is not in the slot or is otherwise unavailable, the service profile will be associated with the server when it becomes available.
Reference:
https://www.cisco.com/en/US/docs/unified_computing/ucs/sw/gui/config/guide/141/UCSM_GUI_C onfiguration_Guide_141_chapter28.html#task_000EC6B4D0BA4AA1B59B8D067B6CC02F


NEW QUESTION # 103
DRAG DROP
An engineer is implementing NetFlow on a Cisco Nexus 7000 Series Switch.
Drag and drop the NetFlow commands from the left into the correct order they must be entered on the right.
Select and Place:

Answer:

Explanation:

Section: Network
Explanation/Reference: https://www.cisco.com/c/en/us/support/docs/switches/nexus-7000-series-switches/112213-netflow- nexus7000-nsox-configex.html


NEW QUESTION # 104
Refer to the exhibit. What is the outcome of this command when the ELPD is updated on a Cisco Nexus 9000 series switch?

  • A. shows a simulated upgrade of the EPLD
  • B. displays the impact of the upgrade on the operation of the switch
  • C. displays the compatibility of the EPLD upgrade and the image in the bootflash
  • D. upgrades the EPLD on the switch disruptively

Answer: B


NEW QUESTION # 105
A cisco Nexus 9000 series switch experiences a startup configuration comuption. The engineer must implement a procedure to recover configuration file from the switch. Which command set must be used?

  • A. 1. Clear the current configuration of the switch
    2. Restart the device.
    3. Copy a previously saved configuration file to the running-configuration
    4. Copy the running-configuration to the startup configuration.
  • B. 1. Clear the current configuration of the switch
    2. Restart the device.
    3. Copy the running configuration to the startup configuration
    4. Copy a previously saved configuration file to the running configuration
  • C. 1.Restarting device.
    2. Copy the running-configuration file to a remote server.
    3. Clear the current configuration of the switch.
    4. Copy the running configuration to the startup configuration
  • D. 1. Copy the running-configuration to the startup configuration.
    2. Clear the current configuration of the switch.
    3. Restart the device.
    4. Copy a previously saved configuration file to the running configuration.

Answer: A

Explanation:
Problems, such as memory corruption, can occur that make it necessary for you to recover your configuration from a backed-up version.
Each time that you enter a copy running-config startup-config command, a binary file is created and the ASCII file is updated. A valid binary configuration file reduces the overall boot time significantly. A binary file cannot be uploaded, but its contents can be used to overwrite the existing startup configuration. The write erase command clears the binary file.
SUMMARY STEPS
1. write erase
2. reload
3. copy configuration-file running-configuration
4. copy running-config startup-config
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus9000/sw/93x/fundamentals/configuration/guide/b-cisco-nexus-9000-nx-os-fundamentals-configuration-guide-93x/b-cisco-nexus-9000-nx-os-fundamentals-configuration-guide-93x_chapter_01010.html#task_1242440


NEW QUESTION # 106
An engineer must configure the order in which the server attempts to boot from available boot device types using Cisco Integrated Management Controller (Cisco IMC). The engineer must change the boot order configuration during the setup and apply the new requirements multiple times. The requirement is to change the Cisco IMC actual boot order so it is different from the configured boot order. Which setting accomplishes this goal?

  • A. Set the boot configuration directly through BIOS.
  • B. Apply UEFI Secure Boot for a nonsupported operating system.
  • C. Enable the system to boot with the configured boot order.
  • D. Configure the legacy and precision boot order to be mutually exclusive.

Answer: C

Explanation:
https://www.cisco.com/en/US/docs/unified_computing/ucs/c/sw/gui/config/guide/1.5/b_Cisco_UCS_C-series_G


NEW QUESTION # 107
Which mroute state is created when Bidirectional PIM is deployed at a site?

  • A. MVPN Type-6
  • B. *,G
  • C. MVPN Type-7
  • D. S,G

Answer: B

Explanation:
Bidirectional PIM has been invented for networks where we have many sources and receivers talking to each other. PIM Sparse mode RP builds 2 entries *, G and S, G but when we use PIM bidirectional mode, the RP will never build a S,G entry and, it only allow the *,G entry. https://www.cisco.com/c/en/us/td/docs/ios-xml/ios/ipmulti_pim/configuration/xe-16-5/imc-pim-xe-16-5-book/imc-tech-oview.html and https://networklessons.com/multicast/multicast-bidirectional-pim


NEW QUESTION # 108
The Cisco Nexus 5600 Series Switch experiences occasional packet drops on interface ethernet 1/16. An engineer wants to implement a SPAN session to investigate the issue further. The network analyzer to which the packets must be directed is located on interface 1/3. The analyzer is limited on disk space available for traffic capture, so the Nexus switch should send only the relevant data. Which two command sets configure the SPAN session that meets these requirements? (Choose two.)

  • A. Option A
  • B. Option C
  • C. Option E
  • D. Option B
  • E. Option D

Answer: A,C

Explanation:
Explanation
https://www.cisco.com/c/en/us/products/collateral/switches/nexus-5000-series-switches/white-paper-c11-733022 The information to be sent is regarding dropped packets only.


NEW QUESTION # 109
A customer data center experiences bandwidth contention that affects the servers connected to the NPV enabled switch The NPV switch is connected to the NPIV switch using two 10 Gb uplinks but the traffic originating front the connected hosts to the core switch exceeds the available bandwidth The engineers decided to add a third uplink to the NPV server to increase the available bandwidth Which set of commands must be used to provision the new uplink?

  • A. Option C
  • B. Option A
  • C. Option D
  • D. Option B

Answer: D


NEW QUESTION # 110
An engineer must implement access control tor Cisco UCS Manager. The configuration must meet these requirements.
* All users and user groups must be configured using Active Directory.
* User1 must have full access to the Fabric Interconnect infrastructure and network security operations
* User1 must have full access to the storage operations configuration.
Which action must be performed on Cisco UCS to meet the requirements?

  • A. Execute a built-in role for the user and RADIUS for the role-mapping for Active Directory.
  • B. Execute a built-in role for the user and LDAP lor the role-mapping for Active Directory.
  • C. Create a custom role tor the user and LDAP for the rote-mappings for Active Directory.
  • D. Create a custom rote tot the user and RADIUS for the role-mapping for Active Directory.

Answer: C

Explanation:
To meet the specified requirements, a custom role needs to be created for User1 that grants full access to both the Fabric Interconnect infrastructure and network security operations, as well as storage operations configuration. This custom role ensures that User1 has the necessary permissions across different areas of the UCS Manager. Using LDAP for role-mapping with Active Directory allows for the integration of UCS Manager with the existing AD infrastructure, enabling centralized management of user credentials and access rights12.
References := The process for integrating Cisco UCS Manager with Active Directory and configuring custom roles can be found in the official Cisco documentation, such as the Cisco Secure Access Control System Configuration Guides and the Cisco Community discussions on UCS Manager and Active Directory integration12. These resources provide step-by-step instructions and best practices for setting up access control in UCS Manager using Active Directory.


NEW QUESTION # 111
A new employee must be granted access to add VLANs into an existing Cisco UCS Manager and configure NTP synchronization with date and time zone settings. Which two privileges must be granted to the employee to complete the task? (Choose two.)

  • A. Ext LAN Policy (ext-lan-policy)
  • B. Service Profile Network Policy (Is-network-policy)
  • C. Service Profile Config (Is-config)
  • D. Ext LAN Config (ext-lan-security)
  • E. Service Profile Compute (Is-compute)

Answer: C,D

Explanation:
The new employee needs to add VLANs into an existing Cisco UCS Manager and configure NTP synchronization with date and time zone settings. Option B, Ext LAN Config (ext-lan-security), grants privileges to configure external LAN connectivity settings including VLANs. Option D, Service Profile Config (Is-config), allows for configuring service profiles including NTP synchronization settings. References
:
* Cisco UCS Manager GUI Configuration Guide, Release 4.0 - Configuring User Accounts and Organizations [Cisco UCS Manager], Configuring User Accounts and Organizations, Configuring Roles
* Cisco UCS Manager CLI Configuration Guide, Release 4.0 - Configuring User Accounts and Organizations [Cisco UCS Manager], Configuring User Accounts and Organizations, Configuring Roles


NEW QUESTION # 112

Refer to the exhibit The communication between the web server and the application server experiences poor performance The network engineer must collect the traffic between the two servers, including the payload for more investigation The collected data must be sent from the remote site to the headquarters. Which action accomplishes this goal?

  • A. Configure SNMP on N5K-1 to send the data to the monitor server
  • B. Configure a SPAN session between N5K-1 and N5K-2
  • C. Configure an ERSPAN session between N5K-1 and N5K-2.
  • D. Configure NetFlow on N5K-1 to send the data to the monitor server

Answer: C


NEW QUESTION # 113
Refer to the exhibit.

Service degradation is reported on a VM that is deployed on a Cisco UCS blade server. The traffic from the vNIC is required to SPAN in both directions to a packet analyzer that is connected to UCS-A slot 2 port 12.
Which two commands are needed to complete the configuration? (Choose two.)

  • A. UCS-A /org/service-profile/vnic/mon-src* # set direction both
  • B. UCS-A /eth-traffic-mon/fabric/eth-mon-session' # create dest-interface 2 12
  • C. UCS-A /org/service-profile/vnic/mon-src* # set direction receive transmit
  • D. UCS-A /eth-traffic-mon/fabric/eth-mon-session* # create eth-mon-session/dest-interface 2 12
  • E. UCS-A /eth-traffic-mon/fabric/eth-mon-session # activate

Answer: A,B


NEW QUESTION # 114

Refer to the exhibit The ASA 1 acts as a Layer 3 gateway for all servers. The servers lose the gateway connectivity when the vPC peer links go down and the vPC keepalive remains up. Which action improves the high availability in the network?

  • A. Create a static port channel with two links from each firewall to the switch
  • B. Enable the vPC peer gateway feature on the vPC devices
  • C. Activate the vPC orphan-port suspend feature on the switch ports connected to the firewall
  • D. Implement the IP reoVect feature on the vPC devices

Answer: B


NEW QUESTION # 115
Refer to the exhibit.

The Cisco NX-OS scheduler must run every day at 3:00 a.m. Which code snippet completes the script?

  • A. time daily 3:00
  • B. time start weekly 7 3:00
  • C. time start daily 3:00
  • D. time weekly 7 3:00

Answer: A


NEW QUESTION # 116

Refer to the exhibit. A secure server that provides services to EPG-2 must be placed in EPG-1. The remaining EPGs-EPG-2, EPG-3. and EPG-4-must communicate without any contracts. Which set of actions accomplishes this goal?

  • A. Option C
  • B. Option A
  • C. Option D
  • D. Option B

Answer: D

Explanation:
Including EPG-2, EPG-3, and EPG-4 in the preferred group allows these EPGs to communicate with each other without requiring any contracts. This is because the preferred group feature in Cisco ACI allows EPGs within the same VRF to communicate by default. However, since the secure server in EPG-1 must provide services to EPG-2, a contract is required between EPG-1 and EPG-2 to facilitate this communication while maintaining the security and policies necessary for the server.
References := For more detailed information on configuring EPGs and contracts in Cisco ACI, you can refer to the Cisco Data Center Core Technologies (DCCOR) study materials and official Cisco documentation. These resources provide comprehensive guidance on the implementation and management of EPGs, contracts, and preferred groups within a Cisco ACI environment.


NEW QUESTION # 117
Refer to the exhibit.

Which command needs to be added to the line starting with the "file" keyword to have the generated running-config file with the name 'fusion-config_' and current date?

  • A. string(Cfusion-config_') + date)
  • B. (*fusion-config_ * date')
  • C. ('fusion-configj) + date
  • D. str.ffusion-configj) + date

Answer: C


NEW QUESTION # 118
......

Get Instant Access REAL 350-601 DUMP Pass Your Exam Easily: https://learningtree.actualvce.com/Cisco/350-601-valid-vce-dumps.html