New 2022 Latest Questions E-S4HCON2022 Dumps - Use Updated SAP Exam [Q25-Q49]

Share

New 2022 Latest Questions E-S4HCON2022 Dumps - Use Updated SAP Exam

Latest E-S4HCON2022 Exam Dumps SAP Exam from Training Expert ActualVCE


SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
SUM Prepare PartPerform the SUM prepare part

ADM328

> 12%
Modification AdjustmentPerform the modification adjustment with SPDD and SPAU

ADM328

8% - 12%
SUM Monitoring and TroubleshootingMonitor and troubleshoot the SUM procedure

ADM328

8% - 12%
Manual Activities for SUMDescribe the necessary manual preparation and follow-on activities for SUM

ADM328

8% - 12%
SUM Execution PartPerform the SUM execution part, including DMO

ADM328

> 12%
DowntimeDescribe the factors influencing downtime and techniques to reduce downtime

ADM328

8% - 12%

 

NEW QUESTION 25
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the messages shown by the SUM UI
  • B. Check the system log (transaction SM21) of the SAP system
  • C. Check the most recent entries shown in file sapevt.trc
  • D. Check the most recent entries in SAPup.log

Answer: A,D

 

NEW QUESTION 26
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. A
  • B. Target DB size will increase temporarily
  • C. DMO can only be run with systems NW740 or NW731

Answer: B,C

 

NEW QUESTION 27
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Activation of dictionary objects (ACT_UPG)
  • B. Modification adjustment (SPDD)
  • C. Conversion of application tables (PARCONVJJPG)
  • D. Switch to new repository (EU_SWITCH)

Answer: A,B

 

NEW QUESTION 28
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. The source system is non-Unicode and the target database is a scale-out system.
  • E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

Answer: A,E

 

NEW QUESTION 29
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. An upgrade of the software components is performed, without changing the database type.
  • B. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • C. A change of the database type is performed, without changing the software components.
  • D. An SAP S/4HANA conversion is performed, without adapting the customer data.

Answer: C

 

NEW QUESTION 30
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored to the environment of user <sid>adm during registration
  • B. The path was stored in file sumabap conf during registration
  • C. The path is taken from the URL entered in the browser to start SUM
  • D. The path was stored in file host_profile during registration

Answer: B

 

NEW QUESTION 31
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • C. The upgrade of the PRD must be finished before you start new development in the DEV.
  • D. The transport between Unicode and non-Unicode systems is forbidden.

Answer: B

 

NEW QUESTION 32
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SWPM using the Load procedure
  • B. SWPM using the Backup / Restore procedure
  • C. SUM with DMO
  • D. SUM without DMO

Answer: A

 

NEW QUESTION 33
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Execution of eCATTs for business validation tests
  • B. Execution of SPDD modification adjustment
  • C. Creation of the table structures in the new SAP HANA database
  • D. Execution of XPRAs and AIMs
  • E. Execution of SPAU modification adjustment

Answer: A,D,E

 

NEW QUESTION 34
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps

Answer: A

 

NEW QUESTION 35
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. During uptime
  • C. During SPDD
  • D. Post-downtime

Answer: B,D

 

NEW QUESTION 36
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of a named user in the development client of the development system
  • B. Credentials of user DDIC in client 000 of the shadow system
  • C. Credentials of user DDIC in the development client of the development system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: A

 

NEW QUESTION 37
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The DMO Guide
  • B. The major SUM Guide
  • C. The SAP S/HANA Conversion Guide
  • D. The Application Guide

Answer: A,C

 

NEW QUESTION 38
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SYCM (Simplification Database Content)
  • B. ATC (ABAP Test Cockpit)
  • C. SAT (Runtime Analysis)
  • D. SE80 (Object Navigator)

Answer: B,D

 

NEW QUESTION 39
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Move the SAPM update archive into the download folder
  • B. Extract the SAP HANA database installation archive
  • C. Extract the SAP HANA client installation archive
  • D. Move the R3trans update archive into the download folder
  • E. Move the stack.xml update file into the download folder

Answer: A,C,E

 

NEW QUESTION 40
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support Packages found in the download directory

Answer: D

 

NEW QUESTION 41
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. Before the downtime starts
  • B. Early in the downtime
  • C. As part of the cleanup process
  • D. At the end of the downtime

Answer: A

 

NEW QUESTION 42
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Shadow repository creation (EU_IMPORT*)
  • B. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • C. ParaUel distribution (PARDIST_SHD)
  • D. Downtime migration (EU_CLONE_MIG_DT_RUN)

Answer: B

 

NEW QUESTION 43
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • C. You need to build up a SI check framework by applying SAP notes.
  • D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

Answer: A,C

 

NEW QUESTION 44
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:

  • A. Check the log files written under "SUM\abap\log"
  • B. Check the dump size of the database export on disk
  • C. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • D. Check the "Charts Control Center" in the SUM UI

Answer: A,D

 

NEW QUESTION 45
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Using DMO when applying Support Packages to SAP ECC 6.07
  • B. SAP S/4HANA conversion to SAP S/4HANA 1709
  • C. Updating to SAP ECC 6.07 using DMO
  • D. Upgrading to SAP ECC 6.08 without using DMO

Answer: B,D

 

NEW QUESTION 46
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Check the compatibility of custom code with SAP S/4HANA
  • B. Apply the recommendations of the simplification list
  • C. Run the database migration to the SAP HANA database
  • D. Perform the migration of data into the new data structure

Answer: A,B

 

NEW QUESTION 47
......


E-S4HCON2022 Exam Certification Details:

Exam:40 questions
Languages:English
Level:Specialist
Sample Questions: SAP E-S4HCON2022 Exam Sample Question

 

Updated Test Engine to Practice E-S4HCON2022 Dumps & Practice Exam: https://learningtree.actualvce.com/SAP/E-S4HCON2022-valid-vce-dumps.html